alwaystouchout.com - a guide to transport projects in london Modes of transport

Road Projects

Sort by: Name | Due completion | Importance | Status | Last update

Thames Gateway Bridge

A new bridge with 2 lanes in each direction for private vehicles, a cycle/footway and two public transport lanes, from Beckton across the Thames to Thamesmead. [more...]

M25 West widening

Widening of the M25 between the M4 (J15) and the M3 (J12) (Heathrow section) to give it 6 lanes in each direction. [more...]

A406 Improvements

Plans to grade-separate the remaining sections of the North Circular with flat junctions - Henlys Corner, Bounds Green & Golders Green Rd - have been dropped in favour of smaller improvement schemes. [more...]

Congestion charge

Changes are planned for the world's largest congestion charging scheme, including a price increase, expansion and smart vehicle tagging. [more...]

National road user charging

The DfT is investigating a satellite-based scheme which charges motorists based on the time of day they drive and the roads they drive on. [more...]

Congestion Charge Western Extension

Extension of the congestion charge zone into Kensington & Chelsea to the west. [more...]

A206 Thames Road upgrade

The last single carriageway section of the main route between Woolwich and the M25 will be dualled. [more...]

M25 four-lane widening

The majority of remaining 3-lane sections of the M25 would be widened under a 1.6bn scheme proposed to start in 2006. [more...]

Low Emission Zone

A Low Emission Zone means charging vehicles not meeting minimum emissions standards for entering Greater London. [more...]

M1 widening

The M1 will be widened to four lanes between the M25 (J6A) and Milton Keynes South (J13) in two stages, starting with the M25 to Luton (J10). [more...]

High Occupancy Vehicle Lanes

A pilot scheme to trial motorway lanes dedicated to cars with 2 or more occupants in the morning rush hour. [more...]

Silvertown Link

A river crossing is proposed from West Silvertown to North Greenwich, to supplement the Blackwall crossing. [more...]

M4 Route Management Strategy

This Highways Agency plan aims to improve the M4 - in London it is considering various strategies including extending the bus lane or tolls. [more...]

M25 South Mimms improvements

Slip roads onto the roundabout at South Mimms have been widened from two to three lanes. [more...]

Blackwall Tunnel refurbishment

Safety in the 108-year-old northbound Blackwall Tunnel will be improved during a proposed refurbishment, following completion of current southbound refurbishment [more...]

Sloane Square improvements

Kensington & Chelsea are consulting on a redesign of Sloane Square to provide more pedestrian space. [more...]

Exhibition Road project

Exhibition Road will be redesigned as part of a 25m project to improve the ambience around the South Kensington institutions. [more...]

Heathrow congestion charge

Congestion charging is being considered at Heathrow to raise money for public transport improvements and reduce emissions. [more...]

Bishop's Bridge Replacement

Bishop's Bridge, which carries the A4206 over the rail approach into Paddington and the Grand Union Canal's Paddington Arm, was replaced with a wider, stronger structure. [more...]

Emissions-banded congestion charge

The congestion charge will be waived for the cleanest vehicles and raised to 25 per day for the most polluting, including those owned by charge zone residents. [more...]
alwaystouchout.com [list all projects | about alwaystouchout.com | links of interest]